Skip to Content

Resource hub

Dogger Bank MPA – Relevant Documentation 2011

Abstract

The documents referred to below and any other historical documents relating to the Dogger Bank MPA were produced during the selection and designation process.

The information available here includes:

  • Standard Data Form – provides details about the SAC and the designated features.
  • SAC Selection Assessment Document – provides detailed information about the SAC and rationale for site selection.
  • Post-consultation Report – gives an overview of the consultation outcomes.
  • Impact assessment – an assessment of the environmental, social and economic costs and benefits of the designation.

The Dogger Bank MPA Site Information Centre is the most up-to-date source of information for this MPA, and will reflect any additional information gathered since these documents were produced.

Please note, these documents were produced prior to the launch of JNCC's new website in 2019. Whilst every effort has been made to redirect material to the relevant content on the new website, some of the links within these documents may no longer work.

Resource type Publication

Topic category Oceans

Reference date 2011··

Lineage
Documents produced during the MPA site selection and designation process

Responsible organisation
Communications, JNCC distributor

Limitations on public access No limitations

Use constraints Available under the Open Government Licence 3.0

Metadata date 2024·04·22

Metadata point of contact
Communications, JNCC

Back to top